Benghazi, Libya · Since 2009 · العربية

Insulation · Flooring · Repair · Contracting

Engineered today.Built for tomorrow.

Libya's specialist in integrated waterproofing, epoxy flooring and construction chemistry — from the technical study through to handover.

Request a site survey
Conceptual concrete portico and reflecting basin on a Mediterranean coast
01 / The architecture of enduranceArchitectural concept
Beneath the surface
Benghazi, LibyaSince 2009
The companySpecified. Supplied. Installed.

We do the part that has to last.

Waterproofing, epoxy flooring and concrete repair are the layers nobody sees and everybody notices when they fail. Since 2009 we have supplied, specified and installed them on Libyan projects — reservoirs and treatment plants, hospital and factory floors, tunnels, bridges and basements — using European systems and our own engineering and technical teams.

Meet Advanced Engineering
2009Founded in Benghazi
15+Years of experience
100+Projects delivered or supplied

Beneath the finish.

A material study

The substrate

Everything rests on this.

Before the finish comes the condition of the concrete. We assess the substrate, address defects and prepare a sound surface for the layers above.

Assess the surfaceRepair. Clean. Prepare.
Conceptual close study of concrete aggregate and a cut material edge
The substrateMacro study

The protective layer

Continuity is the detail.

Waterproofing depends on the whole assembly. The membrane, joints, transitions and terminations are considered together, with a system suited to the exposure.

Connect every detailSurface. Joints. Continuity.
Conceptual macro study of a folded teal protective membrane
The protective layerMacro study

The working surface

The finish follows the function.

A continuous resin floor is specified around what happens above it. Traffic, exposure, slip resistance and maintenance guide the choice of finish.

Specify for real useUse. Finish. Maintenance.
Conceptual macro study of a polished material edge and reflected light
The working surfaceMacro study
Conceptual atrium with a reflective resin floor
Architectural concept. Project records follow below.

A record of work that matters.

Reservoirs and treatment plants, hospital and factory floors, hotels, public buildings and infrastructure. Some of it is fifteen years old and still holding, which is the only performance claim worth making about waterproofing.

01

Olympic Swimming Pool — epoxy

Libya
02

Man-Made River — Sirte main tanks, 30×30 m

Libya
03

Al-Rayhan Factory — epoxy and insulation

Libya

Your next project

Discuss the drawings. Define the next step.

Request a site survey

Share your project details, drawings or specification. Contact our team to discuss a site inspection, technical study or suitable material system.